ODAT observational study · ambient fall detection and wellness indices · 12 rooms × 3 dual-AoP zones · 2× IWR6843AOP + AM62x per unit
Tasks
4/47
Active
6
Blocked
2
Site
MOH
Site
Mount Olivet Home
Grant
ODAT
IRB
UMN HRPP
Protocol
Observational
Device
IWR6843AOP + AM62x
Rooms
12 rooms · 3 zones each
Units
36 sensor nodes
Cloud
AmbientCloud · us-east-1
Phase Timeline · May to Dec 2026
MayJunJulAugSepOctNovDec
IRB Submission & Review
Jul 15
Active
Hardware Procurement
Jul 31
Blocked
Device Provisioning
Aug 15
Pending
Site Deployment
Aug 31
Pending
Data Collection
Oct 31
Pending
Analysis & Readout
Nov 30
Pending
ODAT Grant Reporting
Dec 31
Pending
today
BLOCKED: 2 tasks cannot proceed
Hardware: 36 PCB serial numbers are required from EI Microcircuits before device provisioning can begin. Contact Gavin to follow up on the order status. The provision-batch command is ready and waiting.
Engineering & Clinical Tasks
Draft observational study protocol (HRPP format)Research LeadActive▸
Define data elements: activity index, sleep score, gait scoreIsaacActive▸
Prepare consent/waiver documentation for facility residentsResearch LeadPending▸
Submit HRPP application via UMN STUDY portalResearch LeadPending▸
Respond to HRPP review commentsResearch LeadPending▸
Receive IRB approval letterPending
Execute data sharing agreement with Mount Olivet HomeRandy RossPending▸
Obtain facility liability and liability coverage confirmationRandy RossPending▸
PCB order placed with EI Microcircuits (36 boards)GavinDone▸
Obtain 36 PCB serial numbers from EI MicrocircuitsGavinBlocked▸
Incoming inspection: verify Gerber/BOM/CPL match buildGavinPending▸
Enclosure fabrication (12 units × 3 zones = 36 enclosures)JohannesPending▸
Power supply procurement: Cincon TR15RAM-12 (36 units)GavinPending▸
Cable kits per room (power + Ethernet drop)JohannesPending▸
Burn-in test: 48-hour soak on all 36 unitsIsaac / GavinPending▸